Pentágono
PetrochemicalLNG EngineeringSteel Detailing

Petrochemical Facility Pipe Rack Upgrade

Client: Petrochemical Producer

The Challenge

An aging petrochemical facility needed to add new process piping to existing pipe racks that were already near structural capacity. The challenge required precise load analysis and creative routing to avoid a complete pipe rack replacement.

Our Approach

Our structural engineers performed detailed load analysis of the existing pipe racks using STAAD PRO, identifying pockets of unused capacity. We designed targeted reinforcements and new piping routes that threaded through available space. Our steel detailers produced erection-ready packages coordinated with the facility's maintenance windows.

The Result

Successfully added 12 new process lines without replacing any existing pipe racks. Reinforcement cost was 30% of full replacement. All work completed within scheduled maintenance windows with zero production impact.

12
New Lines Added
30%
Cost vs Replacement
Zero
Production Impact

Facing a Similar Challenge?

Tell us about your project and discover how our team can deliver results like these for you.